Bid Advertisement

Gill Creek Green Infrastructure Project – Advertisement for Bids

Information

Bids are requested for construction of the Gill Creek Green Infrastructure Project which will apply green infrastructure practices to address point and non-point source runoff and pollution entering the creek from the public golf course and two outfalls that flow into Gill Creek.

The goal of the project is to improve water quality and reduce the frequency of harmful algal blooms (HABs) in Hyde Park Lake, along Gill Creek.

Green infrastructure practices that will be implemented through this project include:

  • daylighting a stormwater pipe and creating a meandering surface channel with micro pools and native plants;
  • rerouting stormwater from a pipe through constructed wetlands before it reaches Gill Creek; 
  • creating a pit and mound complex.
Dates

Important dates related to the bid process are as follows:

  • On-site Pre-Bid Meeting (Mandatory) – Tuesday, November 19th at 1:00 PM at the Project Site, 3398 Linwood Avenue, Niagara Falls, NY 14305.
  • Bids Due (Digital) – Wednesday, December 11th at 4:00 PM EST.
Documents

Bidding Documents for the Project can be found at the following designated website:

https://www.avalonbuff-planroom.com/projects/5905/details/gill-creek-green-infrastructure-solutions-project

Bidding Documents
Questions/Contact Info

Project questions can be fielded by contacts designated in the Bidding Documents, unsolicited communications may result in disqualification.

All work performed for BNW must be accomplished with the protection of water resources and the environment in mind.